Hardwood Floor Installation Cost by City (2026)
Updated 2026
Hardwood flooring is priced per square foot for material and labor. Solid vs. engineered wood, species, and subfloor prep set the range. Nationally, expect $4,800-$9,600 for 800 sq ft of flooring. Pick your city below for a localized estimate.
$4,800
Low
$7,200
U.S. Average
$9,600
High
What affects hardwood floor installation cost
- Solid vs. engineered hardwood
- Wood species and grade
- Subfloor prep and leveling
- Old flooring removal
- Finish - prefinished vs. site-finished
Hardwood Floor Installation cost by city
| City | Typical average | |
|---|---|---|
| New York, NY | $8,400 | View → |
| Los Angeles, CA | $8,400 | View → |
| Chicago, IL | $7,500 | View → |
| Houston, TX | $7,100 | View → |
| Phoenix, AZ | $7,200 | View → |
| Philadelphia, PA | $7,300 | View → |
| San Antonio, TX | $7,100 | View → |
| San Diego, CA | $8,400 | View → |
| Dallas, TX | $7,100 | View → |
| Fort Worth, TX | $7,100 | View → |
| Jacksonville, FL | $7,200 | View → |
| Austin, TX | $7,100 | View → |
| San Jose, CA | $8,400 | View → |
| Charlotte, NC | $7,000 | View → |
| Columbus, OH | $7,000 | View → |
| Indianapolis, IN | $6,900 | View → |
| San Francisco, CA | $8,400 | View → |
| Seattle, WA | $8,100 | View → |
| Denver, CO | $7,600 | View → |
| Nashville, TN | $6,900 | View → |
Frequently asked questions
Solid or engineered hardwood?
Engineered is more moisture-stable and often cheaper to install; solid can be refinished more times.
Can hardwood go over concrete?
Engineered hardwood can; solid usually needs a plywood subfloor or sleeper system.
How long does installation take?
A typical room takes 1-3 days, longer if site-finishing is involved.
Figures localized from 2026 national baselines. Informational only - see our methodology.